Gold Agitation Leaching Plants Design
Design of Gold Agitation leaching plants including SART plants
Based on more than 20 years’ experiences of our engineering team, in the gold heap, agitation leaching and flotation plants, we have this capability to do technological tests, Basic design, detail design, installation supervision, commissioning and operation modification of gold plants.
Some of our most important experiences are as follow:
– Started working in the design, construction and operation of a 200 ton pilot per day in Zarshuran gold plant, including peroxidation and leaching during 2001 – 2005
– Presence in Aqh-Dareh agitation gold leaching plant as research and supervision of modification team in 2005
– Participated in the installation and operation of heap leaching and SART gold project of Gedabek mine in the Republic of Azerbaijan in 2009
– Participated in the detailed design engineering team, supervising the installation and commissioning of the Gedabek gold, silver and copper agitation leaching plant in 2013
– Full-time presence and direct contract with Azerbaijan International Mining Company (AIMC) and responsibility for metallurgy in all plants including heap leaching, SART and ADR, agitation leaching, and Responsible for Flotation plant of Gold, silver and copper from 2015 to 2019
– at present, consulting contracts have been signed with several reputable gold production companies in operation, as well as consulting in performing technological tests and performing basic and detailed engineering with several companies.
– If you are facing the problems such as pyrite, copper, mercury, sulfide minerals and carline type in your gold mine, Ata company has experts with sufficient experience in this field, who will solve these issues well, and Solve in the best and minimum possible cost.
we Will Do:
– Carrying out technological tests
– Laboratory tests design, using test design software
– Proposing plant flowsheet based on laboratory results
– Preparing mass balance based on laboratory tests results
– Main equipment selection
– Process plant reagent consumption optimization and checking the cost control
– Preparing plant facilities requirements
– Plant general layout and general arrangement
– Existing plants troubleshooting, capacity and recovery improvement
– Equipment sizing calculation and material selection
– Preparing process piping and instrumentation diagram ( P&I Diagram)
– Preparing plant process operation manual
– Equipment arrangement and installation supervision
– Preparing plant for pre-commissioning and commissioning
– Operators training